What a whole-home renovation costs in Calgary

A whole-home renovation is the largest thing most people will ever do to a building they also have to live near. It is worth being straight about the numbers.

In Calgary, a whole-home renovation starts around $200,000 for a refresh, runs $250,000 to $350,000+ for a complete renovation, and $400,000 to $600,000+ for a major transformation.

Those are large numbers, and they buy something a series of one-room projects cannot: a house that works as a whole. Doing the kitchen this year, the bathrooms in three years and the flooring after that costs more in total, takes longer in disruption, and rarely ends up feeling like one house.

The tier you land in is driven less by square footage than by two questions: are walls moving, and are the mechanical systems being replaced.

Price at a glance

Refresh
$200,000+

Complete renovation
$250,000–$350,000+

Major transformation
$400,000–$600,000+

Your fixed-price quote will vary with your selections and square footage.

The three tiers

The difference between these is not mainly finish level. It is how much of the house you are actually changing.

Refresh

$200,000+

The house keeps its layout. Kitchen and bathrooms renovated, flooring throughout, paint, lighting, doors and trim, and the finishes brought into one coherent scheme.

Best for: a well-built home with a floor plan that already works and finishes that have aged out.

Complete renovation

$250,000–$350,000+

Everything above, plus walls moving. Opening up the main floor, reworking the kitchen footprint, adding or reconfiguring bathrooms, upgrading electrical and plumbing as the walls are open.

Best for: a house in the right location with a layout built for how people lived forty years ago.

Major transformation

$400,000–$600,000+

Structural change at scale. Removing bearing walls, reworking the stair, new windows throughout, mechanical systems replaced, exterior work, and a full interior rebuild.

Best for: taking a home down to what is worth keeping and building the rest properly.

What actually drives the price

1. Whether walls move

This is the single biggest fork. Renovating within an existing layout is a finishes project. Moving a bearing wall brings in engineering, beams, posts, and a load path that has to go somewhere — often all the way to the footing.

2. Mechanical systems

When the walls are open, replacing wiring, plumbing and ductwork costs a fraction of what it costs later. It is also invisible when it is done. It is the least exciting money you will spend and usually the best-spent.

3. Kitchen and bathroom count

These two rooms carry most of the cost per square foot in any house. A home with three bathrooms and a large kitchen is a fundamentally different project from one with a kitchen and a bath and a half.

4. Windows, and the envelope

New windows throughout is a large line item on its own. In an older Calgary home it is often the change with the biggest day-to-day payoff, in comfort and in heating cost.

5. Whether you are living in it

Renovating around an occupied house is slower and more expensive than renovating an empty one. Temporary kitchens, dust control, phasing and working around a family all cost time. Moving out for the duration is faster and less disruptive — and it is not always practical. Both are workable, and the choice belongs in the plan from day one.

6. What the house is hiding

Every home built before 1980 has something. Older wiring, plumbing that has reached the end of its life, framing that has settled, or materials that need proper abatement. On a whole-home project we investigate before we quote, so the number reflects the house you actually own.

The one to watch

Structure is the tier boundary. Once a bearing wall comes out, everything downstream — engineering, beams, posts, foundation — comes with it.

Ask early: does the layout I want require structural work, and has an engineer looked at it?

Ask every quote
  • Is this a fixed price or an estimate?
  • Is engineering included?
  • Are electrical and plumbing upgrades in scope?
  • What is the plan if I stay in the house?
  • How are changes priced and approved?
  • Who is my single point of contact?

What your fixed price includes

On a project this size, what is inside the number matters as much as the number.

Design and drawings
Michelle leads the design, and the house is fully specified before demolition starts.

Engineering where required
Structural work is engineered, permitted and inspected.

Permits and inspections
Pulled and managed for you, start to finish.

All trades and materials
Supplied and installed to the selections you approved.

Site protection and cleanup
Dust control, protection of what stays, and disposal of what does not.

One point of contact
Jonathan is on your job and answers your calls. You will not be handed off.

How long a whole-home renovation takes

Most whole-home projects run four to nine months on site. A refresh sits at the short end. A major transformation with structural work, new windows and replaced mechanical systems sits at the long end, and occasionally past it.

Before that, there is a design and planning phase that typically runs two to four months. On a project of this size that phase is not overhead — it is what keeps the build from stalling. Every selection made before demolition is a decision that cannot hold up a trade later.

We do not begin demolition until the house is designed, the selections are made, and the long-lead materials are accounted for. It feels slow in month one. It is the reason month five moves.

If you are staying in the house

Phasing a project so a family can live in part of the house while the rest is rebuilt is entirely doable, and it changes the schedule. It is worth deciding early rather than halfway through, because the phasing plan affects the sequence of nearly everything.

Rough timeline

Design and selections
2–4 months

Permits and engineering
4–12 weeks, overlapping

On site
4–9 months

Phasing around an occupied home extends the schedule — we plan for it up front.

Whole-home questions we get asked

Is it cheaper to renovate or to buy a different house?
It depends on what you would be giving up. If you like your street, your lot, your neighbours and your commute, renovating keeps all of that and rebuilds the part you do not like. If the location is the problem, no renovation fixes it. We will tell you honestly if we think you are renovating the wrong house.
Should we move out during the renovation?
If you can, it is faster, cleaner and usually less expensive. If you cannot, we phase the work so you keep a functioning part of the house throughout. Both approaches work — the important thing is deciding before the schedule is built.
Can we do it in stages to spread the cost?
You can, and some families do. Be aware it costs more in total: trades mobilise more than once, and some work has to be undone to do the next stage. If budget requires phasing, we will plan the stages so each one is complete on its own and nothing gets built twice.
How do you handle changes once we have started?
Every change is priced and approved by you in writing before the work happens. Nothing proceeds on a handshake and nothing shows up on a final invoice as a surprise.
Do you handle the permits?
Yes. Building, electrical, plumbing, mechanical and any structural permits, plus the inspections that go with them, are managed as part of the project.
Who will actually be running our project?
Jonathan. He is on every job and is your single point of contact from the first conversation to the final walkthrough. Michelle leads the design. Between them there is about forty years of combined experience in this trade.

Let us talk about your home

A project this size deserves a real conversation before anyone talks about price. That is what a discovery call is for.

Or call us directly at 825-425-4119